Chief Patron: Mulchi
Town of Blackstone Water Improvements

Item 283 #4s

Item 283 #4s

First Year - FY2027 Second Year - FY2028
Health and Human Resources
Department of Health FY2027 $3,000,000 FY2028 $0 GF

Language
Page 329, line 9, strike "$89,697,000" and insert "$92,697,000".

Page 329, after line 41, insert:

"Out of this appropriation, $3,000,000 the first year from the general fund shall be provided to the Town of Blackstone for construction of a new water/sewer system.



Explanation

(This amendment provides $3.0 million GF the first year to the Town of Blackstone for construction of a new water/sewer system. The Town of Blackstone assumed ownership of the water treatment plant and water/sewer system from Ft. Pickett during the BRAC actions finalized in 1997. The water/sewer system was constructed in 1942 and is nearly 84 years old. The town has received VDH funding for the preliminary engineering and design phase of the project. The total project cost is nearly $10.0 million. The town projects a 50.0 percent increase in water/sewer rates would be needed to offset construction costs if it cannot secure state/outside grant funds.)