| First Year - FY2005 | Second Year - FY2006 | Totals |
---|
Office of Education | $1,032,174,159 $1,427,829,159 | $42,205,475 $287,389,600 | |
---|
Christopher Newport University | $21,640,000 $23,478,000 | $0 | |
C-8 | Improvements: Renovate Performing Arts Building | $1,840,000 | $0 | |
C-9 | Improvements: Improve Storm Water Management | $2,200,000 | $0 | |
C-10 | New Construction: Construct Parking Deck II | $9,200,000 | $0 | |
C-11 | New Construction: Construct Library/Info Tech Center | $5,000,000 $6,838,000 | $0 | |
C-11.10 | New Construction: Construct Student Center | $3,400,000 | $0 | |
C-11.20 | Improvements: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
The College of William and Mary in Virginia | $68,820,000 $84,220,000 | $0 $16,750,000 | |
C-12 | Improvements: Renovate Commons Dining Hall | $11,493,000 | $0 | |
C-12.10 | New Construction: Construct New Dormitory | $4,200,000 | $0 | |
C-13 | Improvements: Renovate Dormitories | $6,105,000 | $0 | |
C-14 | Improvements: Replace Underground Utilities #1 | $5,801,000 | $0 | |
C-15 | Acquisition: Acquire Property | $1,000,000 | $0 | |
C-15.10 | New Construction: School of Business Building | $40,000,000 | $0 | |
C-15.20 | New Construction: Parking Deck Supplement | $2,821,000 $6,321,000 | $0 | |
C-15.30 | Acquisition: Emergency Generators | $1,600,000 | $0 | |
C-15.40 | Improvements: Improve Intercollegiate Athletic Facilties | $0 | $4,500,000 | |
C-15.50 | Improvements: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
C-15.55 | Improvements: Football Field Practice Facility | $3,250,000 | $0 | |
C-15.60 | Improvements: Historic Campus Buildings | $1,700,000 | $0 | |
C-15.65 | Improvements: Renovation and Expansion of Recreational Sports Center | $2,750,000 | $0 | |
C-15.70 | Acquisition: Williamsburg Community Hospital | $0 | $250,000 | |
C-15.75 | New Construction: Integrated Science Center | $0 | $12,000,000 | |
Richard Bland College | $50,000 | $0 | |
C-16 | Improvements: Renovate Art Building | $50,000 | $0 | |
C-16.10 | Language Only | | |
Virginia Institute of Marine Science | $5,200,000 | $0 $379,000 | |
C-16.20 | New Construction: Marine Research Building Complex | $0 | $379,000 | |
C-17 | Improvements: Improve Information Technology Infrastructure | $1,200,000 | $0 | |
C-17.10 | New Construction: Field Support Center | $2,000,000 | $0 | |
C-17.20 | Improvements: Maury Hall Renovation | $2,000,000 | $0 | |
George Mason University | $177,527,000 $195,867,000 | $0 $13,978,000 | |
C-17.30 | New Construction: Construct Academic II and Parking, Arlington Campus | $815,000 | $3,200,000 | |
C-18 | New Construction: Construct Addition to Krasnow Institute | $6,000,000 | $0 | |
C-18.10 | Improvements: Renovate Commonwealth and Dominion Housing Facilities | $1,925,000 | $0 | |
C-19 | New Construction: Construct Fairfax I | $2,000,000 | $0 | |
C-20 | New Construction: Construct Prince William Performing Arts Center | $35,000,000 | $0 $5,000,000 | |
C-21 | New Construction: Construct Conflict Analysis Facility | $9,000,000 | $0 | |
C-22 | New Construction: Construct Parking Deck III | $21,668,000 | $0 | |
C-23 | Improvements: Renovate Student Housing, President's Park I | $3,340,000 | $0 | |
C-24 | New Construction: Construct Student Union III | $10,021,000 | $0 | |
C-25 | Improvements: Upgrade Old Arlington Building Infrastructure | $1,650,000 | $0 | |
C-26 | Improvements: Renovate and Expand the Physical Education Building | $14,503,000 $17,003,000 | $0 | |
C-26.10 | New Construction: Child Development Center | $0 | $1,800,000 | |
C-27 | New Construction: Construct Student Housing VII | $63,778,000 | $0 | |
C-28 | Improvements: Renovate King Hall, Science and Technology I and Science and Technology II Buildings | $1,942,000 | $0 | |
C-29 | Language Only | | |
C-29.10 | New Construction: Prince William IIIA Supplement | $1,750,000 | $0 | |
C-29.20 | Language Only | | |
C-29.30 | New Construction: Patriot Center Supplement | $2,050,000 | $0 $1,000,000 | |
C-29.40 | Improvements: Center for the Arts | $1,500,000 | $0 | |
C-29.50 | New Construction: North Loop Utility Infrastructure Supplement | $3,325,000 | $0 $378,000 | |
C-29.55 | New Construction: Construct Surge Space on Fairfax Campus | $8,700,000 | $0 | |
C-29.60 | New Construction: Construct Addition to Fieldhouse | $4,400,000 | $600,000 | |
C-29.65 | Language Only | | |
C-29.70 | Acquisition: Property Acquisition | $0 | $2,000,000 | |
C-29.80 | Language Only | | |
James Madison University | $37,390,000 $55,390,000 | $0 $6,460,000 | |
C-30 | New Construction: Construct College of Integrated Science and Technology | $4,369,000 | $0 | |
C-31 | Improvements: Renovate Harrison Hall and Annex | $2,894,000 | $0 $180,000 | |
C-32 | Improvements: Improve Storm and Surface Water Infrastructure - Phase 1 | $5,115,000 | $0 $90,000 | |
C-32.10 | Improvements: Steam Infrastructure Cost Overruns | $0 | $90,000 | |
C-33 | Acqusition: Acquire Property for Future Campus Expansion Acquisition: Acquire Property for Future Campus Expansion | $3,062,000 | $0 | |
C-34 | Acquisition: Acquire Arboretum Property | $350,000 | $0 | |
C-34.10 | New Construction: Multipurpose Recreational Fields | $8,000,000 | $0 | |
C-34.20 | New Construction: Parking Deck | $13,600,000 | $0 | |
C-34.25 | Acquisition: Acquire Contiguous Property on Main Street | $0 | $5,500,000 | |
C-34.28 | New Construction: Construct Educational and Administrative Facility at the Edith J. Carrier Arboretum | $0 | $600,000 | |
C-34.30 | Acquisition: Acquire Property on Cantrell Avenue | $18,000,000 | $0 | |
C-34.40 | Improvements: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
Longwood University | $20,300,000 | $0 $6,971,000 | |
C-35 | Improvements: Modernize Heating Plant, Phase II | $8,144,000 | $0 | |
C-35.10 | Improvements: Bedford Wygal Connector Cost Overruns | $0 | $1,000,000 | |
C-36 | New Construction: Construct Lacrosse/Field Hockey Complex | $3,306,000 | $0 | |
C-37 | Improvements: Renovate Blackwell Hall and Bookstore | $3,850,000 | $0 | |
C-38 | Improvements: Renovate and Improve Auxiliary Facilities | $5,000,000 | $0 | |
C-38.01 | New Construction: Construct Soccer Fields | $0 | $1,751,000 | |
C-38.03 | Improvements: Renovate Lancer Gymnasium and Willett Hall | $0 | $1,650,000 | |
C-38.05 | Improvements: Install Generators for Emergency Preparedness | $0 | $2,013,000 | |
C-38.07 | Language Only | | |
C-38.08 | New Construction: Construct Addition to Willett Hall | $0 | $557,000 | |
University of Mary Washington | $35,350,000 $35,850,000 | $1,500,000 $8,274,000 | |
C-38.20 | New Construction: Construct James Monroe Center Campus Building #2 | $500,000 | $1,700,000 | |
C-39 | New Construction: Construct Convocation Center | $25,000,000 | $0 | |
C-40 | New Construction: Construct Parking Deck | $6,000,000 | $0 | |
C-41 | Improvements: Replace Belmont Roof and Repair Caretaker's House | $250,000 | $0 | |
C-41.10 | Improvements: Dodd Hall Auditorium Renovation Improvements: Renovate Dodd Auditorium and Klein Theater | $1,500,000 | $0 | |
C-41.20 | Acquisition: Property Acquisition | $1,100,000 | $0 | |
C-41.30 | Improvements: Bell Tower | $1,500,000 | $1,500,000 | |
C-41.35 | Acquisition: Acquire Contiguous Property | $0 | $1,500,000 | |
C-41.40 | Improvements: Lee Hall Supplement | $0 | $3,574,000 | |
Norfolk State University | $4,469,000 $8,124,000 | $5,319,000 $15,319,000 | |
C-42 | Improvements: Maintenance Reserve | $1,469,000 $4,407,000 | $1,469,000 | |
C-42.10 | Improvements: Renovate Education Building | $217,000 | $0 | |
C-42.20 | Improvements: Renovate Robinson Technology Building | $500,000 | $0 | |
C-43 | Improvements: Increase Student Access to Technology | $3,000,000 | $0 | |
C-43.05 | New Construction: Construct Rise Center | $0 | $2,000,000 | |
C-43.10 | New Construction: Police and Public Safety Building | $0 | $3,850,000 | |
C-43.15 | Improvements: Renovate and Expand Student Center | $0 | $8,000,000 | |
Old Dominion University | $54,595,869 | $0 $32,466,125 | |
C-43.20 | New Construction: Construct Physical Science Building, Phase II | $0 | $4,947,000 | |
C-44 | Improvements: Renovate Technology Building | $1,741,000 | $0 | |
C-44.10 | Improvements: Batten Arts and Letters Building Cost Overruns | $0 | $735,000 | |
C-44.15 | Improvements: Hughes Hall Cost Overruns | $0 | $446,000 | |
C-45 | Improvements: Install Sprinkler Systems in Chemistry, Life Science and Visual Arts Buildings | $1,475,000 | $0 | |
C-46 | New Construction: Expand Teletechnet Classroom Facilities at Community Colleges | $4,573,000 | $0 | |
C-47 | New Construction: Construct Indoor Tennis Center | $4,000,000 | $0 $293,000 | |
C-48 | New Construction: Construct Elizabeth River Waterfront Development | $2,941,000 | $0 $157,000 | |
C-49 | Improvements: Relocate and Expand Athletic Facilities | $5,736,000 | $0 $323,000 | |
C-50 | New Construction: Construct Village Parking Garage | $8,168,000 | $0 $650,000 | |
C-51 | New Construction: Construct 49th Street Parking Garage | $6,441,000 | $0 $500,000 | |
C-52 | Acquisition: Acquire Land | $2,000,000 | $0 | |
C-52.10 | Language Only | | |
C-52.20 | Improvements: 43rd Street Improvements | $1,020,869 | $0 $500,000 | |
C-52.30 | Improvements: Health and Physical Education Building Renovation and Addition | $16,500,000 | $0 $170,000 | |
C-52.40 | Language Only | | |
C-52.50 | Language Only | | |
C-52.60 | New Construction: New Dormitory | $0 | $23,745,125 | |
C-52.65 | New Construction: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
Radford University | $12,311,000 | $0 $2,799,000 | |
C-53 | Improvements: Replace Dedmon Center Roof | $3,200,000 | $0 | |
C-54 | Improvements: Improve Dedmon Center Facility | $3,500,000 | $0 | |
C-55 | Improvements: Renovate Russell Hall | $4,941,000 | $0 $715,000 | |
C-55.05 | Improvements: Fine Arts Center Cost Overruns | $0 | $1,924,000 | |
C-55.07 | Improvements: Porterfield Hall Cost Overruns | $0 | $160,000 | |
C-55.10 | Improvements: Heth Hall Renovation | $670,000 | $0 | |
C-55.11 | Improvements: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
University of Virginia | $190,116,000 $368,816,000 | $6,000,000 $40,560,000 | |
C-55.15 | New Construction: Medical Research Building (MR-6) | $9,900,000 | $0 | |
C-56 | New Construction: Arts and Sciences Building | $37,816,000 | $0 | |
C-56.10 | Improvements: Fayerweather Hall Renovation and Studio Art Construction | $0 | $5,240,000 | |
C-56.15 | Improvements: Campbell Hall Chiller Cost Overruns | $0 | $850,000 | |
C-57 | New Construction: Construct Alderman Road Housing | $22,500,000 | $0 | |
C-57.10 | Improvements: Renovate Rouss Hall | $8,000,000 | $0 | |
C-58 | Improvements: Upgrade Main Heating Plant for Environmental Compliance | $37,300,000 | $0 | |
C-59 | New Construction: Acquire Property and Construct Medical Education Building | $20,700,000 | $0 | |
C-60 | New Construction: Construct Maywood Connector | $20,000,000 | $0 | |
C-61 | Improvements: Renovate School of Medicine Research Laboratories | $4,000,000 | $0 | |
C-62 | Improvements: Renovate Suhling Research Building Laboratories | $4,000,000 | $0 | |
C-63 | Improvements: Renovate Newcomb Hall Dining Facility | $3,000,000 | $0 | |
C-64 | New Construction: Construct New Residence Halls | $3,100,000 | $0 | |
C-65 | Improvements: Renovate and Improve Academic and Research Facilities | $14,000,000 | $0 | |
C-66 | Improvements: Renovate and Improve Auxiliary Facilities | $3,000,000 | $0 | |
C-67 | Language Only | | |
C-67.10 | New Construction: Campbell Hall Addition Supplement | $3,500,000 | $0 | |
C-67.20 | Improvements: Renovate Varsity Hall | $2,200,000 | $0 | |
C-67.30 | New Construction: Advanced Research Technology Facility | $15,000,000 | $0 $23,870,000 | |
C-67.40 | Improvements: McLeod Hall Addition New Construction: McLeod Hall Addition | $0 | $6,000,000 | |
C-67.50 | New Construction: Construct North Health System Parking Garage | $28,000,000 | $0 | |
C-67.55 | New Construction: Contruct Arts Grounds Parking Garage | $8,000,000 | $2,600,000 | |
C-67.60 | New Construction: Construct Arts Center | $91,000,000 | $0 | |
C-67.65 | New Construction: Construct New School of Education Building | $32,000,000 | $0 | |
C-67.70 | New Construction: Construct Football Practice Field | $1,800,000 | $0 | |
C-67.75 | Improvements: Cocke Hall | $0 | $2,000,000 | |
C-67.80 | Improvements: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
University of Virginia Medical Center | $132,000,000 $226,300,000 | $0 | |
C-68 | New Construction: Construct Clinical Laboratory Building | $10,000,000 | $0 | |
C-69 | New Construction: Construct Children's Medical Center | $48,000,000 | $0 | |
C-70 | Acquisition: Acquire Property and Construct Site Improvements | $30,000,000 | $0 | |
C-71 | Improvements: Renovate Medical Center Facilities | $20,000,000 | $0 | |
C-71.10 | Improvements: Hospital Expansion | $24,000,000 | $0 | |
C-71.11 | Improvements: General Clinical Research Center | $8,500,000 | $0 | |
C-71.15 | New Construction: Construct Clinical Cancer Center | $70,700,000 | $0 | |
C-71.20 | Acquisition: Acquire Virginia Ambulatory Surgery Center Building | $7,000,000 | $0 | |
C-71.25 | Acquisition: Acquire Core Laboratory Building | $8,100,000 | $0 | |
University of Virginia's College at Wise | $4,649,000 $11,834,000 | $0 $1,200,000 | |
C-71.30 | New Construction: Construct New Residence Hall | $7,185,000 | $0 | |
C-72 | Improvements: Replace Water and Sewer Lines and Install Meters | $2,350,000 | $0 | |
C-73 | New Construction: Construct and Relocate Baseball and Softball Fields | $1,500,000 | $0 | |
C-74 | Acquistion: Acquire Buffer Properties | $799,000 | $0 $1,200,000 | |
Virginia Commonwealth University | $111,655,000 $155,019,000 | $14,000,000 $14,695,000 | |
C-75 | Acquisition: Acquire Land Along Broad, Grace, Franklin and Cary Streets | $5,000,000 | $0 | |
C-76 | Improvements: Renovate Business Building | $127,000 | $0 | |
C-76.10 | Improvements: Renovate Hibbs Building Classrooms | $0 | $500,000 | |
C-77 | New Construction: Construct Massey Cancer Center | $2,901,000 $8,901,000 | $0 | |
C-77.05 | New Construction: Construct School of Engineering | $20,225,000 | $0 | |
C-77.10 | Improvements: Renovate Hibbs Building | $0 | $195,000 | |
C-77.20 | Acquisition: University Ad Center | $7,000,000 | $0 | |
C-78 | New Construction: Construct Academic Campus Housing | $20,713,000 | $0 | |
C-79 | New Construction: Construct Tennis Center Complex | $8,006,000 | $0 | |
C-80 | Improvements: Improve Life and Fire Safety Compliance in Various Buildings on Both University Campuses | $2,000,000 | $0 | |
C-80.10 | New Construction: New School of Business | $38,000,000 $45,808,000 | $0 | |
C-80.20 | New Construction: Monroe Campus Parking Deck | $0 | $14,000,000 | |
C-80.30 | Improvements: Renovate Hunton Hall | $5,000,000 | $0 | |
C-81 | New Construction: Construct Game and Inland Fisheries Regional Headquarters at the Rice Center | $1,600,000 | $0 | |
C-82 | New Construction: Construct New School of Nursing | $14,308,000 $16,639,000 | $0 | |
C-83 | Improvements: Renovate West Hospital | $3,000,000 | $0 | |
C-84 | Acquisition: Acquire Land | $5,000,000 | $0 | |
C-85 | Improvements: Renovate Student Dental Simulation Laboratory | $6,000,000 | $0 | |
C-85.05 | Language Only | | |
C-85.10 | Improvements: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
Virginia Community College System | $86,691,290 $87,927,290 | $13,309,475 $50,598,475 | |
C-86 | Improvements: Complete Landscape and Infrastructure Improvements, Thomas Nelson | $250,000 | $0 | |
C-87 | New Construction: Construct Science Laboratory Building, Lord Fairfax | $2,845,000 | $0 | |
C-88 | Improvements: Renovate South Campus, Virginia Western | $208,000 | $0 | |
C-89 | Improvements: Renovate Instructional Buildings, Wytheville | $221,000 | $0 | |
C-90 | New Construction: Construct Advanced Technology and Workforce Development Center, Germanna | $1,500,000 | $0 | |
C-90.10 | New Construction: Construct Fine and Performing Arts Program Building, Blue Ridge | $0 | $1,200,000 | |
C-91 | Improvements: Renovate Nursing and TV Technology Buildings, Northern Virginia, Annandale | $600,000 | $0 | |
C-92 | Improvements: Renovate and Expand Webber Hall, Virginia Western | $419,000 | $0 | |
C-93 | New Construction: Construct Regional Automotive Technology/Workforce Development Center, Tidewater | $1,200,000 | $0 | |
C-93.05 | New Construction: Construct Workforce Training and Technology Center, J. Sargeant Reynolds | $0 | $4,024,000 | |
C-93.08 | New Construction: Construct Workforce Services Development Center, Lord Fairfax (Middletown) | $1,236,000 | $0 | |
C-93.10 | Improvements: Renovate Unsafe and Obsolete Facilities, Dabnesy S. Lancaster | $0 | $530,000 | |
C-94 | New Construction: Construct Addition to HVAC Building, Northern Virginia (Woodbridge) | $500,000 | $0 | |
C-95 | Improvements: Renovate Classrooms and Laboratories, Southside (Christanna) | $33,000 | $0 | |
C-96 | Improvements: Renovate Classrooms and Laboratories, Daniel Campus, Southside Virginia | $206,000 | $0 | |
C-97 | Improvements: Renovate Academic and Administrative Buildings, Thomas Nelson | $520,000 | $0 | |
C-98 | Omitted | | |
C-99 | Improvements: Replace Hastings Hall Heating, Ventilation and Air Conditioning System, Thomas Nelson | $1,932,000 | $0 | |
C-100 | Improvements: Replace Heating and Cooling Systems, Wytheville | $2,750,000 | $0 | |
C-101 | Improvements: Repair Major Mechanical and Electrical Systems, Annandale and Woodbridge Campuses, Northern Virginia | $7,243,000 | $0 | |
C-102 | New Construction: Construct Visual and Performing Arts/Community Cultural Center, Dabney S. Lancaster | $5,618,000 | $0 | |
C-103 | New Construction: Construct Parking Lot and Connector Road for Parham Road Campus, J. Sargeant Reynolds | $1,071,000 | $0 | |
C-104 | New Construction: Construct Parking Garage, Portsmouth Campus, Tidewater | $18,849,000 | $0 | |
C-105 | New Construction: Construct Student Center, Virginia Beach Campus, Tidewater | $20,810,000 | $0 | |
C-106 | New Construction: Construct Student Center, Norfolk Campus, Tidewater | $13,770,000 | $0 | |
C-106.10 | Improvements: Ernst Community Cultural Center Loading Dock, Northern Virginia (Annandale) | $492,000 | $0 | |
C-106.20 | New Construction: New Police Station, Northern Virginia (Annandale) | $540,000 | $0 | |
C-107 | Acquisition: Acquire Property, New River | $350,000 | $0 | |
C-108 | New Construction: Construct Addition to Walker Fine Arts Center, Patrick Henry | $315,000 | $0 | |
C-108.10 | Improvements: Bookstore, Blue Ridge Community College | $400,000 | $0 | |
C-108.20 | Improvements: Construct Science Building Addition, Blue Ridge Community College | $1,834,000 | $0 | |
C-108.30 | Improvements: Lab Renovations, Central Virginia | $750,000 | $0 | |
C-108.40 | Improvements: Major Building Systems Repair and Replacement | $0 | $9,149,475 | |
C-108.50 | Improvements: Blackwater Building, Tidewater Community College | $0 | $4,160,000 | |
C-108.60 | Improvements: Renovate the Top Floor of Galax Hall, Wytheville Community College | $1,465,290 | $0 | |
C-108.65 | New Construction: Construct Bookstore, Woodbridge Campus, Northern Virginia Community College | $0 | $540,000 | |
C-108.70 | Improvements: Renovate Cafeteria, Annandale Campus, Northern Virginia Community College | $0 | $525,000 | |
C-108.75 | Acquisition: Acquire Contiguous Property, Woodbridge Campus, Northern Virginia Community College | $0 | $2,000,000 | |
C-108.80 | Improvements: Improve Campus Recreation Facilities, Southwest Virginia Community College | $0 | $400,000 | |
C-108.85 | Improvements: Supplemental Funding for Previously Authorized Capital Projects | $0 | $25,000,000 | |
C-108.88 | New Construction: Construct Addition to Veterinary Technology Building | $0 | $583,000 | |
C-108.95 | New Construction: Construct Addition to Maintenance Building, J. Sargeant Reynolds | $0 | $787,000 | |
C-109 | Language Only | | |
C-110 | Language Only | | |
C-111 | Language Only | | |
C-112 | Language Only | | |
C-113 | Language Only | | |
C-114 | Language Only | | |
C-115 | Language Only | | |
C-116 | Language Only | | |
C-117 | Language Only | | |
C-117.05 | Improvements: Relocate Parking Lot, Blue Ridge Community College | $0 | $1,700,000 | |
Virginia Military Institute | $23,651,000 $30,837,000 | $0 $33,339,000 | |
C-117.10 | Improvements: Renovate Nichols Engineering Hall | $1,586,000 | $1,586,000 | |
C-117.20 | Improvements: Renovate and Expand Crozet Hall | $0 | $1,453,000 | |
C-118 | Improvements: Renovate Old Barracks for Emergency Repairs | $4,136,000 | $0 | |
C-118.10 | Improvements: Renovate and Expand Old Barracks | $1,900,000 | $0 | |
C-119 | Improvements: Improve Storm Sewer Drainage | $1,315,000 | $0 | |
C-119.10 | Improvements: Renovate Kilbourne Hall Complex | $18,200,000 $21,900,000 | $0 $3,700,000 | |
C-119.15 | New Construction: Construct North Post Leadership and Athletic Facilities | $0 | $13,600,000 | |
C-119.18 | New Construction: Construct Leadership and Ethics Center and Parking Facility | $0 | $13,000,000 | |
Virginia Polytechnic Institute and State University | $16,558,000 | $0 $28,227,000 | |
C-119.20 | New Construction: Construct Biology Building | $0 | $2,737,000 | |
C-120 | New Construction: Construct Bioinformatics Building, Phase II | $3,958,000 | $0 | |
C-120.05 | Improvements: Improve Performing Arts Center | $0 | $10,000,000 | |
C-120.10 | Improvements: Renovate Facility Classrooms, Phase I | $0 | $2,740,000 | |
C-120.15 | Improvements: Improve Soccer and Lacrosse Complex | $0 | $1,250,000 | |
C-121 | Improvements: Improve Major Residence and Dining Hall | $4,000,000 | $0 | |
C-122 | Improvements: Improve Boiler Pollution Controls | $5,850,000 | $0 | |
C-122.10 | Improvements: Renovation of Campus Heating Plant | $2,750,000 | $0 | |
C-122.20 | Language Only | | |
C-122.30 | New Construction: Surge Space | $0 | $8,500,000 | |
C-122.35 | Improvements: Graduate Student Center | $0 | $3,000,000 | |
C-122.40 | Improvements: Nongeneral Fund Capital Outlay Blanket Authorization | sum sufficient | |
Virginia Cooperative Extension and Agricultural Experiment Station | $1,188,000 | $0 | |
C-123 | New Construction: Construct Agriculture and Forestry Research Laboratory Facility | $1,188,000 | $0 | |
Virginia State University | $1,731,000 $5,824,000 | $1,202,000 $10,066,000 | |
C-124 | Improvements: Maintenance Reserve | $1,202,000 $3,606,000 | $1,202,000 | |
C-124.05 | Improvements: Renovate Rogers Stadium | $0 | $2,600,000 | |
C-124.07 | Improvements: Handicapped Accessibility Cost Overruns | $0 | $74,000 | |
C-124.09 | Improvements: Storm Sewer Infrastructure Cost Overruns | $0 | $780,000 | |
C-124.10 | New Construction: Construct New Academic Science and Technology Building | $0 | $3,985,000 | |
C-125 | Improvements: Renovate Gandy Hall Temporary Facilities | $529,000 | $0 $25,000 | |
C-125.05 | Improvements: Student Housing | $0 | $1,400,000 | |
C-125.07 | Improvements: Emergency Generators | $1,000,000 | $0 | |
C-125.09 | Acquisition: Gandy Hall Equipment | $689,000 | $0 | |
Frontier Culture Museum of Virginia | $0 | $375,000 | |
C-125.10 | Improvements: Site Improvements Wetlands Mill and Bowman House Sites | $0 | $375,000 | |
Jamestown-Yorktown Foundation | $7,557,000 $9,415,000 | $0 $2,014,000 | |
C-125.15 | New Construction: Renovate and Expand Jamestown Gallery | $1,500,000 | $0 | |
C-126 | New Construction: Construct Powhatan Indian Village | $265,000 | $0 | |
C-126.10 | New Construction: Replace Jamestown Ships | $1,308,000 | $645,000 | |
C-127 | New Construction: Replace James City Service Authority Sewer Pump Station | $377,000 | $0 | |
C-128 | Improvements: Renovate Yorktown Exhibits | $1,395,000 | $0 | |
C-129 | New Construction: Construct Central Support Complex | $139,000 | $0 | |
C-130 | Acquisition: Establish Jamestown 2007 Special Exhibit | $3,800,000 | $0 | |
C-131 | Improvements: Construct Jamestown Maintenance Building | $46,000 | $0 | |
C-131.10 | Improvements: Jamestown Ships | $950,000 | $0 | |
C-131.20 | Improvements: Mathews Gallery Lighting | $585,000 | $0 | |
C-131.30 | Acquisition: Land Adjacent to Jamestown Settlement | $0 | $1,369,000 | |
The Library of Virginia | $0 | $100,000 | |
C-131.80 | Improvements: Exhibition Gallery | $0 | $100,000 | |
The Science Museum of Virginia | $900,000 | $500,000 | |
C-132 | Language Only | | |
C-133 | Improvements: Renovate East Terrace and East Stairway | $900,000 | $0 | |
C-133.10 | Improvements: Replace Exhibits | $0 | $500,000 | |
Virginia Museum of Fine Arts | $17,825,000 | $0 $2,319,000 | |
C-134 | Improvements: Expand and Renovate Museum | $15,206,000 | $0 $1,500,000 | |
C-135 | Improvements: Replace Cooling Tower | $827,000 | $0 | |
C-135.10 | Improvements: Upgrade Security System | $1,792,000 | $0 | |
C-135.20 | Improvements: Replace Deteriorating Plywood | $0 | $819,000 | |