|  | First Year - FY1999 | Second Year - FY2000 | Totals | 
|---|
|  Office of Education | $363,223,546 | $222,098,000$231,544,000
 |  | 
|---|
|  Department of Education | $0 | $0 |  | 
| Virginia School for the Deaf and the Blind at Staunton | $1,303,000 | $0 |  | 
| C-17.30 | Improvements:  Replace Campus Steam Line | $1,303,000 | $0 |  | 
|  Virginia Community College System | $90,391,546 | $6,079,000$6,129,000
 |  | 
| C-18 | Improvements:  Repair and Replace Roofs, Virginia Western | $159,000 | $0 |  | 
| C-18.10 | New Construction:  College Services Building, Virginia Western | $0 | $1,125,000 |  | 
| C-18.20 | New Construction: Planning for Workforce Development Center at Locust Grove, & Fredericksburg Campus, Phase II, GermannaNew Construction:  Planning for Workforce Development Center at Locust Grove, Culpeper Technical Center, Germanna
 | $0 | $500,000$475,000
 |  | 
| C-18.30 | Improvements:  Planning for Exterior Paneling Repairs, J. S. Reynolds | $0 | $95,000 |  | 
| C-18.40 | New Construction:  Economic Development Center Supplement, Southside Virginia | $0 | $350,000 |  | 
| C-18.50 | New Construction:  ADA Compliance, Danville | $0 | $175,000 |  | 
| C-18.60 | New Construction:  Planning for Maintenance Facility, Danville | $0 | $28,000 |  | 
| C-18.70 | New Construction:  Planning for Parham Road Campus, Phase IV, J. S. Reynolds | $0 | $250,000 |  | 
| C-18.80 | New Construction:  ADA Compliance, Virginia Western and Northern Virginia | $0 | $500,000 |  | 
| C-18.90 | Improvements:  Campus Renovations, Supplement, Dabney S. Lancaster | $0 | $240,000 |  | 
| C-19 | Improvements:  Fauquier Campus, Phase I, Lord Fairfax Community College | $317,000 | $0 |  | 
| C-20 | Improvements:  Connect Campus to City Water Supply, Locust Grove Campus | $418,000 | $0 |  | 
| C-21 | Construction:  Community Cultural Center:  Middletown | $12,942,000 | $0 |  | 
| C-22 | Construction:  Arts and Technology Center: Loudoun | $9,850,000 | $0 |  | 
| C-23 | Omitted |  |  | 
| C-24 | Construction:  Medical Education Campus, Northern Virginia Community College | $24,460,000 | $1,000,000 |  | 
| C-25 | Construction:  New Academic Building at Virginia Beach | $22,957,000 | $0 |  | 
| C-26 | Improvements:  Humanities and Social Science Building, Piedmont, Phase II | $132,000 | $1,716,000 |  | 
| C-26.10 | New Construction:  Planning for Fredericksburg Area Campus, Phase II, Germanna | $347,000 | $0$75,000
 |  | 
| C-26.15 | Improvements:  Renovation of Godwin and Holton Halls, Mountain Empire | $2,000,000 | $0 |  | 
| C-26.20 | Improvements:  Building Renovations, Annandale Campus, Northern Virginia | $2,000,000 | $0 |  | 
| C-26.25 | New Construction:  Western Campus, Phase II Supplement, J. Sargeant Reynolds | $500,000 | $0 |  | 
| C-26.30 | Acquisition:  Downtown Campus Parking, J. Sargeant Reynolds | $500,000 | $0 |  | 
| C-26.35 | New Construction:  Workforce Development Center, Paul D. Camp | $4,775,000 | $0 |  | 
| C-26.40 | New Construction:  Maintenance Facilities, Eastern Shore | $280,000 | $0 |  | 
| C-26.45 | New Construction:  Parking Garage Supplement, Alexandria Campus, Northern Virginia | $1,000,000 | $0 |  | 
| C-26.50 | Improvements:  Veterinary Technology Facilities, Blue Ridge | $900,000 | $0 |  | 
| C-26.55 | New Construction:  Manufacturing Technology Training Center, Central Virginia | $2,500,000 | $0 |  | 
| C-26.60 | New Construction:  Regional Center for Applied Technology Training, Danville | $3,500,000 | $0 |  | 
| C-26.65 | Language Only |  |  | 
| C-26.70 | Improvements:  Water System Supply Repairs | $854,546 | $0 |  | 
| C-26.80 | Reversion Clearing Account:  Project Management | $0 | $0 |  | 
| C-26.90 | Improvements:  Campus Renovations, Wytheville | $0 | $100,000 |  | 
| C-26.95 | Language Only |  |  | 
|  University of Virginia, Academic Division | $89,784,000 | $77,261,000$73,361,000
 |  | 
| C-27 | Construction:  Campbell Hall Addition | $2,900,000 | $0 |  | 
| C-28 | Improvements:  Renovate Gilmer Hall, Phase III | $2,500,000 | $0 |  | 
| C-29 | Improvements:  Renovate Jordan Hall | $2,000,000 | $0 |  | 
| C-30 | Construction:  Environmental Science Field Station | $2,000,000 | $0 |  | 
| C-31 | Improvements:  Renovate and Improve Academic & Research Facilities | $8,000,000 | $6,000,000 |  | 
| C-32 | Improvements:  Renovate and Improve Auxiliary Facilities | $3,000,000 | $0 |  | 
| C-33 | Improvements:  Renovate Pavilion Balconies | $550,000 | $0 |  | 
| C-34 | Improvements:  Repair Steam Tunnels | $800,000 | $0 |  | 
| C-35 | Improvements:  Clark Hall Renovation and Addition | $28,258,000 | $0 |  | 
| C-36 | New Construction:  East Precinct Chiller Plant | $9,976,000 | $0 |  | 
| C-36.10 | Improvements:  Central Grounds Electrical Upgrade | $800,000 | $0 |  | 
| C-36.20 | Improvements:  Pavillion VII Renovation | $3,000,000 | $0 |  | 
| C-36.30 | New Construction:  Special Collections Library | $26,000,000 | $0 |  | 
| C-36.40 | Planning:  Plan for the Replacement of Campbell Hall Chiller | $0 | $125,000 |  | 
| C-36.50 | Improvements:  Renovate Lambeth Field Residence Area | $0 | $4,381,000 |  | 
| C-36.60 | Improvements:  Renovation of School of Medicine Facilities | $0 | $2,400,000 |  | 
| C-36.70 | New Construction:  Planning for Darden School Expansion | $0 | $4,000,000 |  | 
| C-36.71 | New Construction:  Nuclear Magnetic Resonance Units Addition | $0 | $1,205,000 |  | 
| C-36.72 | New Construction:  Law School Expansion | $0 | $6,000,000 |  | 
| C-36.73 | New Construction:  Ruffner Hall Parking Lot | $0 | $750,000 |  | 
| C-36.74 | New Construction:  Admissions Building | $0 | $6,700,000 |  | 
| C-36.75 | New Construction:  Addition to National Radio Astronomy Observatory | $0 | $7,400,000$1,500,000
 |  | 
| C-36.76 | New Construction:  Planning for New Arena | $0 | $10,000,000 |  | 
| C-36.77 | New Construction:  Planning for Health Sciences Research Center | $0 | $4,000,000 |  | 
| C-36.78 | New Construction:  Observatory Hill Dining Hall Expansion | $0 | $11,500,000 |  | 
| C-36.79 | Improvements:  Plan Fayerweather Hall Renovation | $0 | $400,000 |  | 
| C-36.80 | New Construction:  Art Studios/Parking Garage | $0 | $1,400,000 |  | 
| C-36.81 | New Construction:  Engineering Research Center | $0 | $11,000,000 |  | 
| C-36.82 | Improvements:  Renovate Peabody Hall | $0 | $2,000,000 |  | 
| University of Virginia Medical Center |  |  | 
| C-37 | Language Only |  |  | 
| C-38 | Improvements:  Renovate Digestive Health Center | $3,600,000 | $0 |  | 
| C-39 | Construction:  Construct or Acquire Child Care Center | $2,400,000 | $0 |  | 
| C-40 | Omitted |  |  | 
| C-41 | Improvements:  Renovate Medical Center Facilities | $10,000,000 | $0 |  | 
| C-41.10 | Acquisition:  Dialysis Center | $1,100,000 | $0 |  | 
| C-41.20 | Planning:  Plan for the Construction of Kluge Children's Rehabilitation Center | $0 | $4,000,000 |  | 
| C-41.30 | Improvements:  Improve Ambulatory Care Clinics | $0 | $4,440,000 |  | 
| University of Virginia's College at Wise | $9,726,000 | $1,000,000 |  | 
| C-42 | Improvements:  Renovate and Construct Addition to Science Building | $9,726,000 | $0 |  | 
| C-42.10 | Improvements:  Campus Infrastructure | $0 | $1,000,000 |  | 
|  Virginia Polytechnic Institute and State University, Instructional Division | $7,002,000 | $37,845,000$42,666,000
 |  | 
| C-43 | Construction:  New Chemistry and Physics Building | $1,400,000 | $23,794,000$25,794,000
 |  | 
| C-44 | Planning:  Alumni Center, Continuing Education Center and Hotel Complex | $2,309,000 | $0 |  | 
| C-45 | Improvements:  Renovate Auxiliary Facilities | $2,000,000 | $0 |  | 
| C-45.10 | New Construction:  Replacement of Dairy Science Center | $293,000 | $3,950,000 |  | 
| C-45.15 | Improvements:  Retrofit Centrifugal Chillers | $0 | $1,150,000 |  | 
| C-45.20 | New Construction:  Building and Construction Learning Lab | $1,000,000 | $0 |  | 
| C-45.25 | Construction:  Construct Advanced Communications Center | $0 | $0 |  | 
| C-45.30 | Language Only |  |  | 
| C-45.40 | Improvements:  Conversion of Upper Quad | $0 | $8,951,000 |  | 
| C-45.50 | Language Only |  |  | 
| C-45.60 | New Construction:  Construct Football Practice Fields | $0 | $2,821,000 |  | 
| Virginia Cooperative Extension and Agriculture Experiment Station | $2,512,000 | $456,000 |  | 
| C-46 | Planning:  Agriculture and Forestry Research Laboratory Facility | $1,167,000 | $456,000 |  | 
| C-46.10 | Improvements:  Replace Hampton Roads Facility | $1,345,000 | $0 |  | 
|  Virginia Commonwealth University, Academic Division | $41,949,000 | $9,711,000 |  | 
| C-47 | Acquisition:  Property to Support Cary, Franklin, Broad, Grove and 8th Streets | $4,225,000 | $0 |  | 
| C-48 | Improvements:  Technology Access Auxiliary Enterprise Facilities | $3,200,000 | $0 |  | 
| C-49 | Improvements:  Renovate School of Dentistry Building | $2,700,000 | $0 |  | 
| C-50 | Improvements:  Renovate Hibbs Building | $3,500,000 | $0 |  | 
| C-51 | Improvements:  Energy Conservation | $2,000,000 | $0 |  | 
| C-52 | Construction:  Sciences Building | $21,907,000 | $0 |  | 
| C-53 | Improvements:  Renovate Sanger Hall | $841,000 | $9,338,000 |  | 
| C-54 | Improvement:  Renovation of Anderson Gallery | $1,395,000 | $0 |  | 
| C-54.10 | Improvements:  Sports Medicine Center | $2,181,000 | $0 |  | 
| C-54.20 | Improvements:  Planning for Renovation of Business Building | $0 | $90,000 |  | 
| C-54.30 | Improvements:  Planning for Renovation of Hibbs Building | $0 | $83,000 |  | 
| C-54.40 | Improvements:  Planning for Renovation of Libraries | $0 | $200,000 |  | 
|  Old Dominion University | $6,190,000 | $12,650,000 |  | 
| C-55 | Construction:  Renovate and Construct An Addition to Constant Hall | $800,000 | $11,750,000 |  | 
| C-55.10 | Acquisition:  Property Adjacent to Campus and East of Hampton Boulevard | $5,000,000 | $0 |  | 
| C-55.20 | Improvements:  Diehn Arts Center Humidification | $390,000 | $0 |  | 
| C-55.30 | Construction: Plan Engineering and Computational Sciences Building | $0 | $900,000 |  | 
|  George Mason University | $31,238,000 | $1,806,000 |  | 
| C-56 | Improvements:  Renovate Student Union Facilities | $5,000,000 | $0 |  | 
| C-56.10 | Improvements:  Arlington Campus Renovations | $0 | $1,400,000 |  | 
| C-56.20 | Improvements:  Utilities Infrastructure | $0 | $406,000 |  | 
| C-57 | Improvements:  Physical Education Building Renovation | $5,500,000 | $0 |  | 
| C-58 | Construction:  Expand General Parking | $500,000 | $0 |  | 
| C-59 | Construction:  Academic Building Four, Fairfax Campus | $19,238,000 | $0 |  | 
| C-59.10 | New Construction:  Planning for Prince William Campus, Phase III | $1,000,000 | $0 |  | 
|  The College of William and Mary in Virginia | $895,000 | $6,507,000$10,357,000
 |  | 
| C-60 | Improvements:  Upgrade Underground Utilities:  Storm Drainage | $295,000 | $0 |  | 
| C-60.10 | Acquisition:  Property Acquisition Blanket | $600,000 | $0 |  | 
| C-60.20 | Improvements:  Replace and Upgrade Heating and Cooling Systems in Various Buildings | $0 | $5,707,000 |  | 
| C-60.30 | Improvements:  Plan Renovation and Expansion of Millington Hall | $0 | $800,000 |  | 
| C-60.40 | Improvements:  Lake Matoaka Amphitheater | $0 | $3,850,000 |  | 
| Richard Bland College | $642,000 | $340,000 |  | 
| C-61 | Improvements:  Replace Outside Lighting | $0 | $340,000 |  | 
| C-62 | Improvements:  Replace and Repair Boiler and Ventilation Systems | $642,000 | $0 |  | 
| Virginia Institute of Marine Science | $6,290,000 | $450,000$1,100,000
 |  | 
| C-63 | Improvements:  Replace Gloucester Point Bulkhead | $862,000 | $0 |  | 
| C-63.10 | Acquisition:  Masterplan Properties | $0 | $450,000$1,100,000
 |  | 
| C-64 | Improvements:  Upgrade Energy Management and Control System | $737,000 | $0 |  | 
| C-65 | Acquisition:  Wachapreague Property | $195,000 | $0 |  | 
| C-65.10 | Acquisition:  Sowers' Property | $280,000 | $0 |  | 
| C-65.20 | Improvements:  Renovation and Expansion of Byrd Hall | $4,216,000 | $0 |  | 
|  James Madison University | $10,909,000 | $3,880,000 |  | 
| C-66 | Construction:  New Alumni House | $1,250,000 | $0 |  | 
| C-66.10 | New Construction:  Plan College of Integrated Science and Technology, Phase III | $0 | $800,000 |  | 
| C-66.20 | Improvements:  Renovation of Warren Hall | $0 | $1,500,000 |  | 
| C-67 | Construction:  New Sports Services Building | $1,409,000 | $0 |  | 
| C-68 | Construction:  Arboretum Nature Center | $3,000,000 | $0 |  | 
| C-68.10 | Acquisition:  Medical Arts Office Complex | $3,500,000 | $0 |  | 
| C-68.20 | New Construction:  Alumni House | $1,750,000 | $0 |  | 
| C-68.30 | Improvements:  Provide Supplemental Funding for Campus Steam Line Repair | $0 | $1,580,000 |  | 
|  Christopher Newport University | $2,168,000 | $4,178,000$4,978,000
 |  | 
| C-69 | Acquisition:  Land on Shoe Lane | $497,000 | $0 |  | 
| C-69.10 | New Construction:  Criminal Justice Academy | $0 | $150,000 |  | 
| C-69.20 | New Construction:  Maintenance Facility Planning | $0 | $150,000 |  | 
| C-70 | Improvements:  Renovate and Construct An Addition to Ratcliffe Gymnasium | $171,000 | $2,278,000$3,078,000
 |  | 
| C-70.10 | Acquisition:  Warwick Boulevard Properties | $500,000 | $1,000,000 |  | 
| C-70.20 | New Construction:  Performing Arts Center | $1,000,000 | $750,000 |  | 
|  Longwood College | $2,093,000 | $9,547,000$12,347,000
 |  | 
| C-70.30 | Planning:  New Science Building | $0 | $860,000 |  | 
| C-70.40 | Improvements:  Plan Renovation of and Addition to Jarman Auditorium | $0 | $100,000 |  | 
| C-71 | Equipment:  Purchase Equipment for Hiner Building | $1,575,000 | $0 |  | 
| C-72 | Improvements:  Renovate East, West, and Main Ruffner Complex | $518,000 | $8,587,000$11,387,000
 |  | 
|  Norfolk State University | $201,000 | $3,542,000 |  | 
| C-73 | Improvements:  Renovate Communications Building | $201,000 | $3,392,000 |  | 
| C-73.10 | Improvements:  Renovation of Robinson Technology Building | $0 | $150,000 |  | 
|  Mary Washington College | $2,894,000 | $5,491,000 |  | 
| C-74 | Improvements:  Renovate Combs Hall | $688,000 | $5,491,000 |  | 
| C-75 | Improvements:  Upgrade Goolrick Hall HVAC | $2,206,000 | $0 |  | 
| C-75.10 | Language Only |  |  | 
| C-75.20 | Language Only |  |  | 
| Melchers-Monroe Memorials | $500,000 | $175,000 |  | 
| C-75.30 | Improvements:  Renovation of Belmont | $500,000 | $175,000 |  | 
|  Radford University | $11,050,000 | $905,000 |  | 
| C-76 | Acquisition:  Property for Site Development | $450,000 | $0 |  | 
| C-76.10 | Improvements:  Planning for Renovation of Peters Hall | $0 | $600,000 |  | 
| C-76.20 | Acquisition:  Fairfax, Howe and Adams Street Properties | $0 | $305,000 |  | 
| C-77 | Improvements:  Improve Electrical Distribution System | $800,000 | $0 |  | 
| C-78 | Construction:  Track and Soccer Field, Phase II | $1,900,000 | $0 |  | 
| C-79 | Improvements:  Improve Steam Distribution System | $715,000 | $0 |  | 
| C-80 | Construction:  Renovate and Construct Addition to Student Center | $4,622,000 | $0 |  | 
| C-81 | Improvements:  Renovate Walker Hall | $2,563,000 | $0 |  | 
|  Virginia Military Institute | $10,229,000 | $500,000 |  | 
| C-82 | Language Only |  |  | 
| C-83 | Improvements:  Renovate Scott-Shipp Hall | $10,229,000 | $500,000 |  | 
|  Virginia State University | $8,554,000 | $15,010,000 |  | 
| C-84 | Improvements:  Renovate Rogers Stadium | $2,840,000 | $0 |  | 
| C-85 | Improvements:  Repair Dormitories, Phase II | $1,939,000 | $0 |  | 
| C-86 | Improvements:  Renovate Johnston Memorial Library | $1,617,000 | $9,210,000 |  | 
| C-87 | Improvements:  Renovate Owens Hall | $394,000 | $5,800,000 |  | 
| C-87.10 | Improvements:  Renovate Virginia Hall Auditorium | $1,764,000 | $0 |  | 
|  The Science Museum of Virginia | $2,107,000 | $3,167,000$3,342,000
 |  | 
| C-88 | Improvements:  Install Fiber Optic Cable | $40,000 | $460,000 |  | 
| C-89 | Improvements:  Integrate the Science Museum Campus Area | $2,000,000 | $1,855,000 |  | 
| C-90 | Improvements:  Renovate East and West Terrace | $67,000 | $852,000$1,027,000
 |  | 
|  Virginia Museum of Fine Arts | $2,160,000 | $0$200,000
 |  | 
| C-91 | Improvements:  Conduct A Fire Suppression System Planning Study | $200,000 | $0 |  | 
| C-92 | Improvements:  Upgrade the Security Alarm and Access Control System | $1,786,000 | $0 |  | 
| C-92.10 | Improvements:  Plan Robinson House Renovations | $174,000 | $0 |  | 
| C-92.20 | Planning:  Parking Deck | $0 | $200,000 |  | 
|  Jamestown-Yorktown Foundation | $5,253,000 | $10,908,000 |  | 
| C-93 | Improvements:  Jamestown Settlement, Phase II Supplement | $550,000 | $501,000 |  | 
| C-94 | Improvements:  Jamestown Settlement Cafe | $2,470,000 | $780,000 |  | 
| C-95 | Construction:  Linkage Between Visitor Center and the Jamestown Gallery | $385,000 | $4,128,000 |  | 
| C-96 | Planning:  Park Entry for Jamestown's 2007 Celebration | $0 | $694,000 |  | 
| C-97 | Planning:  Renovation and Expansion of the Jamestown Gallery | $1,500,000 | $4,805,000 |  | 
| C-98 | Planning:  Commemorative Monument for 2007 | $125,000 | $0 |  | 
| C-99 | Planning:  Plan A Plaza for the Commemorative Monument for 2007 | $223,000 | $0 |  | 
|  Frontier Culture Museum of Virginia | $83,000 | $0 |  | 
| C-100 | Construction:  Replace Maintenance Facility | $50,000 | $0 |  | 
| C-101 | Improvements:  Create Emergency Accessway | $33,000 | $0 |  | 
|  Gunston Hall | $0 | $2,250,000 |  | 
| C-101.10 | Improvements:  General Renovations and Additions | $0 | $2,250,000 |  |