General Services, Department of FY2007 $16,753,272 FY2008 $0 GF

Language
Page 426, line 4, insert:
"C-7.10 New Construction: Renovation of the 9th Street Office Building and Replacement of the 8th Street Office Building (17091)
1. The Department of General Services shall enter into an interim agreement under the Public-Private Education Facilities and Infrastructure Act of 2002 (§ 56-575.1 et seq. of the Code of Virginia) to provide:
a. Architectural and engineering work up through production of final working drawings for renovation of the 9th Street Office Building and replacement of the 8th Street Office Building, as described in paragraph 2 of this Item,
b. Demolition of the 8th Street Office Building.  The contract for such demolition shall be entered into no later than June 30, 2006 and the demolition work begun no later than August 1, 2006, and
c. Such ancillary services as may be necessary to complete the work authorized in this Item.
d. The cost of this interim agreement shall not exceed the $16,753,272 provided in this Item.
2. The architectural and engineering work provided for in paragraph 1, of this Item, shall provide working drawings and detailed cost estimates for:
a. Renovation and expansion of the 9th Street Office Building into an office building of approximately 193,000 gross square feet for continued use by the Commonwealth, and
b. Construction of a new office building on Broad Street between 8th Street and 9th Street, which shall be used primarily as an office building for the Commonwealth, but may provide for limited commercial and retail space on the first floor.  This structure shall be designed to provide approximately 375,000 gross square feet with approximately 270 on-site parking spaces, which would utilize approximately 111,000 gross square feet of this total.
c. The total cost for both the renovation of the 9th Street Office Building and the new office building on Broad Street is estimated at $139,610,605.
3. That portion of the design work provided for in paragraph 2, of this Item, that is related to the use of the renovated 9th Street Office Building and the new office building on Broad Street as temporary office space for the Legislative Branch of government shall be carried out in cooperation with representatives of each legislative agency.
4. The General Assembly determines that time is of the essence in making available the facilities described herein, and the Department of General Services is directed to initiate the project as soon as practical following the enactment of this Chapter.
5. The Governor shall
a) report periodically to the Chairmen of the Senate Finance and House Appropriations Committees on the plans and status of this project for their review and comment, and b) provide the final, full appropriation for this project in his budget submission to the 2007 Session of the General Assembly.  The cost of the on-site parking may be borne by the state employee parking fund only if such parking spaces will be routinely made available to the general state workforce on a continuing basis after work on the General Assembly Building is completed.
6. It is anticipated that sufficient general fund appropriations or Virginia Public Building Authority bond authorization will be provided in future fiscal years to cover all phases of the project as specified in the final contract."

                             
"C-7.10 Renovation of the 9th Street Office Building and Replacement of the 8th Street Office Building
$16,753,272
 
 
Fund Sources: General
$16,753,272"
 
 



Explanation
(This amendment provides $16.8 million GF for architectural and engineering work through working drawings, and related support costs associated with replacement of the 8th Street Office Building and renovation of the 9th Street Office Building.)